Projects for Trello
Centralize all your Trello work in one place with Gantt charts, live reports, card syncing, and board groups.

What is Projects (by Placker)?
Projects by Placker connects all your Trello work in one place. Get Gantt charts, live reports, card syncing, and board groups. Track time spent on cards automatically.
✨ Key Features
- Visualize project timelines with Gantt charts
- Get live reports and track team progress
- Sync cards automatically across multiple boards
- Combine boards into unified views
- Manage team workload and capacity
- Track multiple projects from one dashboard
👥 Perfect For
- Project managers tracking multiple project deadlines
- Agile teams managing sprints and team capacity
- Event planners coordinating timelines and team members
- Team leaders keeping everyone aligned with dashboards
- Portfolio managers overseeing multiple projects
- Teams working across departments together
Start with a 15-day free trial. Get started in minutes. No credit card required.
Trusted by teams worldwide
See what our customers have to say
"This might be the best project management program I've ever used. Good job!"
"You can see multiple boards at a higher level by installing the Placker power-up in Trello in a concise and user-friendly view."
"You have a fantastic, polished product - very well designed UI and great functionality. Placker is my go-to portal for all of my work. Keep up the amazing work!"
"If you want to sync cards between different boards or create sub-tasks, I am recommending Placker on almost a daily basis."
"Thank you for this amazing tool, it has already improved the way we track and execute big complex projects."
"The Gantt chart functionality is fantastic! It makes project tracking so much easier."
"Fast, reliable, and impressively comprehensive. The configuration options exceeded my expectations."
"I am soo happy to have found Placker. Amazing and JUST what I need as a manufacturing company! All these others seem to cater for agencies and don't get it!!"
"It was the best solution I could find for us to be able to measure if cards were completed on time. The dashboards are great."
"I use trello extensively and have been waiting for ages for a gantt plugin to work. Tried two other ones, but they were very buggy and messy. Placker is intuitive and I have yet to experience any bugs in my trello+placker workflow. Love it! Actually I'm so excited I've been telling a bunch of friends and colleagues about it since I tried it out. I just LOVE Placker already, and have organized our planning in it. Will definitely be a long term user."
"We are very pleased with Placker. It is helping us to organize our projects in a collaborative and agile way!"
"This is the kind of tool that makes life easier for a project manager."
"Wow. What a great combination Trello and Placker. I have tried all manner of Trello Gantt Power-Ups and extensions. None are in the same galaxy as Placker. Please keep up the great work."
"For me everything is working perfectly, the app is very good and is being useful in many projects."
"I am loving Placker. First of all, i can use it online, without needing to install anything. Secondly, i use a lot Trello for engineering projects, so they synergize perfectly. Congratulations to you all."
"I love how I can visually see all the tasks that need to be done and the ease that I can just drag and drop these project checkpoints into new positions and easily make achievable deadlines for myself, also LOVING the time commitment tracker at the bottom, to give a more realistic picture about how much work can be done during the work day."
"I am so happy with the Power-Up. Thank you."
"The Gantt chart offered a comprehensive birds-eye view of my project, enabling me to streamline the planning process. Its numerous functionalities ensured that I could easily organize and monitor the various stages of my research."
"Your product is pretty awesome. It's a huge step in the right direction to allow us to keep using Trello, but also to get a Gantt chart."
Live Updates
Real-Time Project Visibility
Dashboards and timelines refresh automatically as work happens. Always see current status without manual updates.
- Auto-Syncing Dashboards
- Dashboard widgets refresh automatically as board data changes.
- Live Timeline Updates
- Timelines adjust automatically when dates are changed on cards.
- Instant Progress Tracking
- Monitor status changes immediately as they happen without manual refreshing.

Cross-Board Sync
Unified Workspace
Connect all your Trello boards. View, sync, and manage everything from one place while teams work their own way.
- Connect unlimited boards into one system
- Scale your operations by linking as many boards as needed into a single, cohesive ecosystem.
- Centralize control without disrupting teams
- Gain management oversight and control while allowing teams to execute work in their own space.
- Sync and manage from a single view
- Control synchronization rules and manage cross-board tasks from one central interface.

Complete Toolkit
All-in-One Project System
The essential toolkit you need in one power-up: Gantt charts, live reports, card syncing, and board organization. No juggling multiple tools.
- See everything updates automatically
- Live dashboards, Gantt timelines, and reports update in real-time as your team works. No manual refresh needed.
- One power-up replaces four separate tools
- Get Gantt charts, live reports, card syncing, and board groups in a single power-up. Simpler setup, one subscription.
- Work stays synchronized across all boards
- Changes made anywhere instantly reflect everywhere. Perfect alignment without manual updates or board switching.

Ready to supercharge your Trello boards?
Start your 15-day free trial today. No credit card required.